Invitation to Prequalify EPC Contractor for the Muzizi Hydropower Project (48 MW), Uganda
The Project will be executed by one EPC Contractor. The Pre-Qualification process will be carried out simultaneously for two separate Lots.
Lot 1 : Civil engineering and construction of hydraulic structures such as the dam/weir, intake and reservoir, water conveyance structures such as headrace tunnel, pressure shaft, pipe gallery, powerhouse and tailrace channel, as well as foundations for the switchyard facilities and 132‑kV and 33-kV transmission lines, access roads and operators’ permanent camp and all other civil structures of a hydro power plant including compensation measures . The scope includes also the O&M Management and training of the O&M staff of the Client.
Lot 2: Engineering, manufacture, supply, installation and commissioning of all mechanical and electrical works including three (3) high-head, multi-jet (6), vertical-axis Pelton turbines and generator sets including control systems, transformers, SCADA, switchyard and balance of plant; it also includes hydro-mechanical equipment (powerhouse and dam), steel-lined pressure shaft, steel penstock pipes and the 132‑kV and 33-kV transmission lines. The scope includes also the O&M Management and training of the O&M staff of the Client.
Bidding Documents
No bidding documents have been included in this request for tenders.